cable bridge host tower斜拉桥主塔
bridge e tower桥塔
cable stayed bridge main tower斜拉桥主塔
draw bridge tower吊桥
bridge pylon bridge tower桥塔
foundation of bridge tower索塔基础
bridge tower bridgehead桥塔
bridge tower wake桥塔尾流
displacement of bridge tower桥塔位移
Finally, a pier and a bridge tower are analyzed to make a preliminary verification of the proposed method.
最后以桥墩和桥塔结构为算例,对该方法进行了初步验证。
参考来源 - 随机风浪作用下结构的动力响应分析方法研究